Future-automation PM Manuel d'utilisateur Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
Installation: Stage 1
Page 5 of 14 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PM - Projector Mount System
Assembly Construction
Construct the PM System as shown below. Slide the
projector bar through the main body and then fix the
front and rear bar clamps to each end of the bar.
Position the cross plates to match the mounting pattern
on the projector being used.
Slide the Projector Bar
though the Main Body
Attach the Clamps at both
ends and fix as shown
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 15 16

Commentaires sur ces manuels

Pas de commentaire