Installation: Stage 6
Page 10 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
ML - Heavy Duty Lift Mechanism
Adjusting the Flap Closed Position
CABINET BASE - SIDE VIEW
1. - By adjusting the white screw, at each side
of the lift, you can adjust the tilt of the flap.
CABINET BASE - PLAN VIEW
2. - By loosening the M6 bolts on each side under
the flap, you can adjust the position of the flap in the
cabinet top. Aim for a 3mm [1/8”] gap all round.
CABINET BASE - SIDE VIEW
3. - For further adjustment
you can adjust the push
rod length by screwing the
studding in or out.
1.
2.
3.